Green E Power
  ȨÀ¸·Î »çÀÌÆ®¸Ê ºü¸¥Áú¹®´äº¯ CPµî·Ï CP·Î±×ÀÎ
·Î±×ÀΠȸ¿ø°¡ÀÔ ºñ¹øÃ£±â

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

   
  ´ë°üÀÎÇã°¡
  Åä¸ñ
  °ÇÃà
  ±â°è
  Àü±â
  °èÃø
  ¹ßÀü
  ȯ°æÈ­ÇÐ
  Á¶Á÷¹×¿¹»ê
  ±âŸ
 
Ȩ > º¹ÇÕÈ­·Â±â¼ú > ±â°è ÀÎ±â¼ø | Ãßõ¼ø | Ãֽŵî·Ï¼ø
º¹ÇÕÈ­·Â ¹ßÀüÇ÷£Æ® 3Â÷¿ø.. 0¿ø Á¶È¸¼ö: 9
º¹ÇÕÈ­·Â ¹ßÀüÇ÷£Æ® 3Â÷¿ø ¼³°èÀÇ °³¼±¹æ¾È/Improvement of 3D design in the Combined Cycle Power Plant
PDFÆÄÀÏ + PDFÆÄÀÏ
  »ó¼¼º¸±â  
Å»»ê¼ÒÁ¦ Â÷´Ü ¼öó¸® ÀÇÇÑ.. 0¿ø Á¶È¸¼ö: 0
Å»»ê¼ÒÁ¦ Â÷´Ü ¼öó¸® ÀÇÇÑ ¹è¿­È¸¼öº¸ÀÏ·¯ Àú¾ÐÁõ±â¹ß»ý±â ¿¬°á¹è°ü³»ÀÇ À¯µ¿°¡¼ÓºÎ½Ä Àú°¨/Reduction of the Flow Accelerated Corrosion within Low Pressure Evaporator Connection Pipe by Interception of Hydrazine for Water Treatment
PDFÆÄÀÏ + PDFÆÄÀÏ
  »ó¼¼º¸±â  
Gas Turbine ¼³ºñ°³¼±À» Åë.. 0¿ø Á¶È¸¼ö: 0
Gas Turbine ¼³ºñ°³¼±À» ÅëÇÑ Àü·Â¼ö±Þ ¾ÈÁ¤¼º È®º¸¹æ¾È/Electricity Supply Stabilization through Gas Turbine Inlet Air Cooling Facility
PDFÆÄÀÏ + PDFÆÄÀÏ
  »ó¼¼º¸±â  
150 §Ó±Þ °¡½ºÅͺó Àú¾Ð 1.. 0¿ø Á¶È¸¼ö: 0
150 §Ó±Þ °¡½ºÅͺó Àú¾Ð 1´Ü ȸÀüÀÍ ±³Ã¼Áֱ⠿¬Àå °¡´É¼º ¿¬±¸/Extension Feasibility on Replacement Cycle of Rotor Blade Equipped for Low Pressure First Stage in a 150 MW Gas Turbine
PDFÆÄÀÏ + PDFÆÄÀÏ
  »ó¼¼º¸±â  
º¹ÇÕÈ­·Â¹ßÀü ÇϺλçÀÌŬ .. 0¿ø Á¶È¸¼ö: 0
º¹ÇÕÈ­·Â¹ßÀü ÇϺλçÀÌŬ ¸ðµ¨¸µ ¹× µ¿ÀûÇØ¼®/Bottoming cycle modeling and dynamic analysis at combined cycle power plant/4. ¹ßÀüÇ÷£Æ®
PDFÆÄÀÏ + PDFÆÄÀÏ + PDFÆÄÀÏ + PDFÆÄÀÏ
  »ó¼¼º¸±â  
¹ßÀü¿ë °¡½ºÅÍºó µ¿Àû °Åµ¿.. 0¿ø Á¶È¸¼ö: 0
¹ßÀü¿ë °¡½ºÅÍºó µ¿Àû °Åµ¿ ½Ã¹Ä·¹ÀÌ¼Ç Tool °³¹ß ¹× ÇØ¼®/Develoment of Transient Behavior Simulation Tool and Analysis of Gas Turbines/04. ¹ßÀüÇ÷£Æ®
PDFÆÄÀÏ + PDFÆÄÀÏ
  »ó¼¼º¸±â  
½Å±Ô ¿¬±¸°úÁ¦ Á¦¾È¼­(2016.. 0¿ø Á¶È¸¼ö: 7
½Å±Ô ¿¬±¸°úÁ¦ Á¦¾È¼­(2016³â/¹è°ü¸Á¿¡ ´ëÇÑ ºÎ½Ä ¹æ½Ä ¹× ±â±âÀÇ ÀÌ»óÀ¯¹« Áø´Ü °ú ¿¹¹æÁ¤ºñ ½Ã½ºÅÛ ±¸Ãà)
¾Æ·¡ÇÑ±ÛÆÄÀÏ + ¾Æ·¡ÇÑ±ÛÆÄÀÏ + ÆÄ¿öÆ÷ÀÎÆ®ÆÄÀÏ
  »ó¼¼º¸±â  
3.°¡½ºÅÍºó ¼³ºñ°³¼±À» Åë.. 0¿ø Á¶È¸¼ö: 19
3.Power supply stability through measures to improve the gas turbine plant (Fogging System / Absorption -Refrigeration compared)//°¡½ºÅÍºó ¼³ºñ°³¼±À» ÅëÇÑ Àü·Â¼ö±Þ ¾ÈÁ¤¼º È®º¸¹æ¾È(Fogging System µ¿¿µ»ó)
±âŸ + ±âŸ + ±âŸ + ±âŸ
  »ó¼¼º¸±â  
1.°¡½ºÅÍºó ¼³ºñ°³¼±À» Åë.. 0¿ø Á¶È¸¼ö: 12
1.Power supply stability through measures to improve the gas turbine plant (Fogging System / Absorption -Refrigeration compared)//°¡½ºÅÍºó ¼³ºñ°³¼±À» ÅëÇÑ Àü·Â¼ö±Þ ¾ÈÁ¤¼º È®º¸¹æ¾È(Fogging System/Absorption -Refrigeration ºñ±³ °ËÅä)
¾Æ·¡ÇÑ±ÛÆÄÀÏ + ÆÄ¿öÆ÷ÀÎÆ®ÆÄÀÏ + ¿öµåÆÄÀÏ + PDFÆÄÀÏ
  »ó¼¼º¸±â  
150MW±Þ °¡½ºÅͺó ¾Ð·Âºñ .. 0¿ø Á¶È¸¼ö: 4
Prediction efficiency changes with increasing pressure ratio 150MW-class gas turbine during operation data//150MW±Þ °¡½ºÅͺó ¾Ð·Âºñ Áõ°¡½Ã ¿îÀüÀڷḦ ÀÌ¿ëÇÑ ¿­È¿À² º¯µ¿ ¿¹Ãø/Çѱ¹¹ßÀü±³À°¿ø ¹ÚÁØÃ¶ ±³¼ö
ÆÄ¿öÆ÷ÀÎÆ®ÆÄÀÏ + PDFÆÄÀÏ + PDFÆÄÀÏ + PDFÆÄÀÏ
  »ó¼¼º¸±â  
 1 [2][3][4][5][6][7][8][9][10]
 
    
 
ȸ»ç¼Ò°³ | ÀÌ¿ë¾à°ü | °³ÀÎÁ¤º¸Ãë±Þ¹æÄ§ | °í°´¼¾ÅÍ | ¸¶À̹ڽº | »çÀÌÆ®¸Ê